Activating maximum completions allowable lets you limit the total number of times a Content can be completed by all players. This feature helps simulate a first-come, first-served system—once the limit is reached, the challenge will no longer be available.
To do so:
- On the Project Manager page, search for and select the Topic where the content is located.
- In the Topic Manager, find the content you want to edit and click on it.
- Scroll down to the Scheduling and Frequency Settings section.
- Locate “Maximum completions allowed”.
-
Enter the maximum number of completions allowed.
- Default settings is Unlimited completions.
- Once the Content reaches the maximum number of completions, the Content automatically expires.
- Click "Save" to apply your changes.
|
NOTE:
|
Comments
0 comments
Please sign in to leave a comment.